Warning: Cannot modify header information - headers already sent by (output started at /home/dealkhus/cosmoread.com/wp-includes/formatting.php:5100) in /home/dealkhus/cosmoread.com/wp-content/themes/cosmoread/header.php on line 18

Warning: Cannot modify header information - headers already sent by (output started at /home/dealkhus/cosmoread.com/wp-includes/formatting.php:5100) in /home/dealkhus/cosmoread.com/wp-content/themes/cosmoread/header.php on line 19

Warning: Cannot modify header information - headers already sent by (output started at /home/dealkhus/cosmoread.com/wp-includes/formatting.php:5100) in /home/dealkhus/cosmoread.com/wp-content/themes/cosmoread/header.php on line 20

Warning: Cannot modify header information - headers already sent by (output started at /home/dealkhus/cosmoread.com/wp-includes/formatting.php:5100) in /home/dealkhus/cosmoread.com/wp-content/themes/cosmoread/header.php on line 21
Home » Featured » In July, the first squadron of the Air Force to get Tejas

In July, the first squadron of the Air Force to get Tejas

In July, the first squadron of the Air Force to get Tejas

#Cosmoread: After waiting for more than three decades, the Indian Air Force at the end of the fourth month following the indigenous Tejas light combat aircraft with the delivery of the first squadron to get your hands on.

However, the first squadron of 16 aircraft just above the minimum that usually makes for a squadron of Tejas aircraft globally Gaur, the opposite will be built in. State Hindustan Aeronauties limitted, Tejas manufacturer to run air force 1 July fourth plane will pass.

The fourth aircraft will be used for training and familarisation. Rather than wait for the LAC Mk II, the Indian Air Force with over 40 modifications of existing Tejas had decided to go in with an improved version.

Acquire120 Tejas aircraft to the Indian Air Force currently has the following major modifications, with 100 plans. Force Active Power Scanned Array (AESA) Rader, integrated electronic warfare (EW) suite, mid-air refueling capability and wants beyond sight range missiles.

According to the production plan, six aircraft this year (2015-16) will be created and Hal later eight and 16 aircraft per year it will scale.